Magnolia Drive Trail
Project Description
This project provides multimodal connectivity along the entire corridor from South Adams Street to Apalachee Parkway. It is being constructed in phases and in coordination with utility improvements in the area. Construction began in summer 2021.
Project Improvements
- Roadway reconstruction
- Underground electric
- Enclosed stormwater drainage system
- Multi-use trail
- Landscape buffers between the path and roadway
Project Status
- The design for Phase 3 (Diamond to Apalachee) is 90% complete, and right-of-way acquisition is ongoing.
Project Manager
Junious Brown
Staff Contact: (850) 219-1063